老旧小区市政改造排水管工程施工方案与流程目录一、施工方法...........................................................................................21、施工工艺流程...............................................................................2二、施工措施...........................................................................................31.管沟开挖.......................................................................................32.管道施工.......................................................................................3(1)施工工艺...............................................................................3(2)浇筑平基施工要点...............................................................3(3)下管、安管施工要点...........................................................3(4)浇筑管座注意事项...............................................................4(5)管道基础混凝土模板...........................................................4(6)管道平口砼接口施工...........................................................4施工准备测量放样管沟开挖护壁保护基底碎石平整夯实管基浇筑管节安装管壁浇筑检查并砌筑接口浇筑接口养护闭水试验管沟回填一、施工方法本工程排水管管径分D200、D250、D300、D400、D500、D600、D700七种,埋设深度为0.7~1.5m,管道基坑开挖采用挖掘机开挖,人工浇筑管基、管座,管道采用人工配合机械安管。1、施工工艺流程二、施工措施1.管沟开挖管沟采用挖掘机开挖,就近堆放,留着回填用,基坑开挖后要对基坑边波进行保护。2.管道施工管道施工采用平基层法,人工配合机械安管。(1)施工工艺支平基模板→平基混凝土→下管→安管→支管座模板→浇180°管座混凝土→抹带接口→养护→污水管闭水试验→回填土方(2)浇筑平基施工要点I.验槽合格后,应及时浇筑平基混凝土,减少地基扰动的可能;II.应严格控制平基顶面高程,不得高于设计高程,亦不低于设计高程10mm;III.平基混凝土终凝前不得泡水,并按规程进行养护;(3)下管、安管施工要点I.平基混凝土强度达到5Mpa以上时,方可下管;II.下管前在平基面上弹线,管上方拉线以控制安管中心线和标高;III.安管时对口间隙,减少错口现象,稳管以达到管内底高程偏差在正负10mm之内,中心线偏差不超过10mm,相邻管内底错口不大于3mm为合格;IV.管安好后,用干净石子或碎石卡牢,并及时灌筑混凝土管座。(4)浇筑管座注意事项I.浇筑前,平基应凿毛或刷毛,并冲刷干净;II.浇筑混凝土时,应两侧同时进行,防止将管挤偏;III.较大的管,浇筑时应同时进入配合勾捻内缝,直径<700mm的管,用麻袋球或其他工具在管内来回拖动,将流入管内的灰浆拉平;(5)管道基础混凝土模板I.根据基础厚度,模板采用定型钢模或[24槽钢,支撑采用木桩。II.支模时面板对准给定的基础边线垂直竖立,内外打撑钉牢,内侧打钢钎固定,配合浇筑进行拼装,并处理好拼缝防止漏浆,并在面板内侧弹线控制混凝土浇筑高度。(6)管道平口砼接口施工a)施工工艺流程管口凿毛清洗→浇注管座混凝土→人机配合下管→管道套接→管道接口塞膨胀水泥钳缝→接口浇筑砼抹带→勾捻管内上部管缝→内外管口养护