GUANGDONGARCHITECTURECIVILENGINEERING201311JAN2013No.11,720m、1051800m,34,36082m2,147.35m,12.15m,2~4、5、65.5,5.0,4.5m,4.05m,4.2m,4,。、1~3。250,;500.6kNm2,B;1.4。;;7,0.1g,。张龙生(广州市设计院广州510620):某高层办公楼高147m,采用框架-核心筒结构,为保证结构延性,针对超限情况及结构体系提出性能设计目标,利用承载力及变形验证不同水准下结构与构件的抗震性能,并采用三维空间分析软件进行整体分析,计算结果表明通过采取相应的设计措施可以实现预定的性能目标,工程抗震性能良好,结构体系安全可行,可为类似工程提供参考。:B级高度的高层建筑;框架-核心筒结构;整体分析;超限类型和程度;性能设计StructureTotalAnalysisandDesignontheUltra-limitHigh-riseBuildingZhangLongsheng(GuangzhouDesignInstituteGuangzhou510620,China)Abstract:Ahighbuildingstatesisheightof147m.Itusesframework-corebarrelstructure.Inordertoguaranteetheductilityofthestructure,theperformance-basedseismicdesignmethodisadoptedanditsperformanceobjectivesareproposed.Seismicperformancesofthestructureandcomponentsareverifiedbasedonbearingcapacityanddeformationresultsunderdifferentlevels.Theresultsindicatethattheperformanceobjectivescanbewellrealizedbyproperdesignmeasures,andthestructureissafeandreliable,forreference.Keywords:B-levelhighstructure;frame-tubestructure;overallanalysis;thetypeandextentofultra-limit;performancedesign12訳4訴53①②③④11141A髿鬅鬄鬂鬁鬀AB450045009000600010500450075009000900012000105005250034500121()()()145、()()(、),(),2SATWEETABS(s)T1,T2,T3,T4,T5,T6,T7,T8,T93.9204(X),3.7527(Y),3.1138(T),1.2114,1.1655,1.0357,0.6831,0.6290,0.55073.8519(X),3.7452(Y),3.2121(T),1.1737,1.1548,0.9993,0.6666,0.5997,0.5121XY12198116111118010880Q0Wt(%)XY1.841.761.741.69Q0(kN)XY105949740100309603XY871752874833873500907600M0(kN·m)XY929959866214928600905700△uHX;Y1903(21F);1963(26F)1764(21F);1849(21F)X;Y1976(21F);11114(20F)11155(22F);11281(20F):JAN2013No.12013113,-,;:h=100~150mm,150mm。300×800~400×800,200×300~300×600,1000×1000~600×600mm()、f1500~f800(),200~800mm,C60~C30。B,,,,《》,D,,,,1。44.1B,PKPM-SATWE(2010)ETABS(9.7.3),2。⑴,。,1、2,,;;,12121(X),13727(Y),75.6%(X),82.5%(Y),0.4%~43.1%,50%。ETABSX1764(21),《》。SATEWEETABS,X,1.4(1.40),《》3.4.5:X12121《》3.7.340%12000,X1.431.481.6,。SATWEETABSTtT10.85。⑵3,、、、,X、Y。4.2B。5SATWEPUSH&EPDA,,13JAN2013No.1201311,:⑴SAWTE,、、1;⑵SATWE,,4。,。3A、B2,,,,,;⑶SATWE,7%,0.50s,0.30,,5。⑷PUSH&EPDASATWE。,,,。:,,,,(~5)0.6%。,,,,,,,,5。1100,《》3.7.5,“”。66.1CSIETABS9.7.0PKPM2010SATWE,(PUSHOVER)。6.2B,,,。6.3,,0.5,0.75,0.750.9。6.4,,《》9.2.214,,4。6.5,《》D。6.6PUSHOVER,0.6%;6.74,,150,0.25%;,、。6.8。6.912m,,。77.1,、、、、、。7.2、、,,“、、”,。7.3,,,。7.4,,,,,,,。[1]GB50009-2001[S][2]GB50011-2010[S][3]GB50010-2010[S][4]JGJ3-2010[S]14