21GUANGDONGARCHITECTURECIVILENGINEERING201366JUN2013No.6,,,,,,、、,,,。,,,(1);,,,,[1]。,,。1,,(2),,:→→→→→→→。,,,(),,,。22.1王伟民(汕头市建筑工程总公司深圳分公司深圳518031):填充墙化学粘结后植式拉结筋施工方法目前已普遍应用到现场施工,本文通过对该法相关规范的理解分析以及在施工实践过程中碰到的问题进行探讨,以指导施工。:填充墙;拉结筋;化学粘结后植筋;施工及检测DiscussionontheConstructionandDetectionofPostEmbeddedConnectingBarinInfillWallWangWeimin(ShantouConstructionEngineeringGeneralCorporationShenzhen518031,China)Abstract:ThemethodofpostembeddedconnectingbarinInfillwallhasbeenwidelyappliedtoconstructionsite.Thispaperanalyzestherelevantcodeofthemethod,anddiscussesproblemsthatoccurinconstructingprocess,providingabetterguidancetopractice.Keywords:infillwall;connectingbar;postembeddedconnectingbarwithchemicalbonding;constructionanddetection51:JUN2013No.6201366,。,,,。,,,。,。、:GB50367-2006《》12.1.5“()”;JGJ145-2004《》3.3.1“”;GB50203-2011《》9.2.3“、、,,()”。,,。,,:,15,50;、;;-5℃~40℃,-15℃~60℃,;。,、、,,,,。。,。2.2GB50003-2011《》6.3.4.2,,500mm2f6(240mm3f6),700mm。HPB235f6,,,。,,f624,f612,f8、f10、f143,(50,75,100,140)mm4;,11.14~12.95kN,、,11.01~18.34kN,,,35%;,,[6]。《》2.1.5“”“———,”。,,,,。2.3,,,,、。,,,,,,、。(),100mm(3),《32f6@5002f6@5002f6@500、、LLL)L:L≥200;,L≥100523≤905281~5002091~1508501~120032151~280131201~320050150120238123234131250552(1)-5(2)-100122(1)-20(2)-401334(1)-8(2)-160122(1)-32(2)-642657(1)-13(2)-260334(1)-50(2)-10039610JUN2013No.6201366》7.0.3“7.0.3hef,mind”,100mm,“HRB335,HRB335”。,。2.4,,20125GB50203-2011《》,:;;,。9.2.3,、、,,。6.0kN。、;2min5%。1、。2。3。B1~2。:,(),。:100,151~280,313,1300,;12,,2213,21,;,2600。8m2,6.8,3200,22,50,1100。,,,,;,。,。,,。3、,、,,,,,。(47)5313()12JUN2013No.6201366,50mm,2。5.454:、,53。,,,,,,。6,,31,54,,,、、、,。!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!1133003300280025003000330033002800250030002500330033002800250030002500330033002800250030002500330033002800250030002500⑤,①,②,,③④,、;GB50203-2011《》,,,。[1],,.[R].,2008.6[2]GB50367-2006[S][3]JGJ145-2004[S][4]GB50203-2011[S][5]GB50003-2011[S][6].[J].,2010(5)[7]GBT50344-2004[S](53)47