目录一、工程概况........................................................2二、编制依据........................................................2三、电源进线、配电室、总配电箱,分配电箱的装设位置及线路走向........2四、进行负荷计算....................................................3施工现场用电量统计表............................................3确定用电负荷(需要系数法)........................................3五、选择变压器......................................................6六、设计配电系统....................................................6干线1线路计算..................................................6七、绘制临时供电施工图.............................................231、临时供电系统图..............................................23八、配电箱电器配置接线图...........................................25九、防雷与接地装置.................................................341、接地装置图..................................................342、塔吊的防雷接地:............................................34十、防护措施与安全用电措施.........................................341、安全用电技术措施............................................352、安全用电组织措施............................................423、环境保护与职工健康安全......................................42十一、安全用电防火措施.............................................431、施工现场发生火灾的主要原因..................................432、预防电气火灾的措施..........................................44一、工程概况工程名称施工单位建设单位监理单位设计单位建筑地点项目经理技术负责人建筑面积44000结构类型框剪层数22建筑高度69.25开工日期2008年4月30日竣工日期2009年8月31日二、编制依据《施工现场临时用电安全技术规范》JGJ46-2005《建筑施工安全检查标准》JGJ59-99《建筑施工手册》本工程施工图纸及《岩土勘察报告》三、电源进线、配电室、总配电箱,分配电箱的装设位置及线路走向施工现场电源进线由市政电网引至配电室,配电室设在施工现场西北角,施工用电源线由配电室引入至施工现场,据用电规范规定,工程采用TN-S系统,实行三级配电两级保护,施工现场设一个符合标准的的总配电箱,型号为JSP-Z/2-B,下设分配电箱6台,开关箱31台。总分配电箱、开关箱施工用电线的布置严格按照《施工现场临时用电安全技术规范》规定。根据施工现场用电设备布置情况,采用导线穿钢管埋地敷设,布置位置及线路走向参见临时配电系统图及现场平面图,采用三级配电,两级防护。四、进行负荷计算1.施工现场用电量统计表序号机具名称型号安装功率(KW)数量合计功率(KW)1插入式振动器1.144.42砂轮切割机2.212.23钢筋弯曲机3.827.64砂浆搅拌机4.0416.05木工圆锯5.515.56钢筋调直机5.515.57钢筋切断机5.5211.08照明箱10.0550.09照明箱15.0115.010塔式起重机QTZ4021.7365.111施工升降机SC20033.04132.012交流电焊机35.0270.013对焊机100.01100.02.确定用电负荷(需要系数法)Kx:用电设备组的需要系数Cosφ:铭牌额定功率因数Pjs:用电设备组的有功计算负荷Qjs:用电设备组的无功计算负荷Pe:用电设备组的额定功率插入式振动器,数量n=4Kx=0.70,cosφ=0.80,tgφ=0.75,Pe=1.10×4=4.40KWPjs=Kx×Pe=0.70×4.40=3.08KWQjs=Pjs×tgφ=3.08×0.75=2.31KW砂轮切割机,数量n=1Kx=0.70,cosφ=0.80,tgφ=0.75,Pe=2.20×1=2.20KWPjs=Kx×Pe=0.70×2.20=1.54KWQjs=Pjs×tgφ=1.54×0.75=1.16KW钢筋弯曲机,数量n=2Kx=0.70,cosφ=0.80,tgφ=0.75,Pe=3.80×2=7.60KWPjs=Kx×Pe=0.70×7.60=5.32KWQjs=Pjs×tgφ=5.32×0.75=3.99KW砂浆搅拌机,数量n=4Kx=0.70,cosφ=0.80,tgφ=0.75,Pe=4.00×4=16.00KWPjs=Kx×Pe=0.70×16.00=11.20KWQjs=Pjs×tgφ=11.20×0.75=8.40KW木工圆锯,数量n=1Kx=0.70,cosφ=0.80,tgφ=0.75,Pe=5.50×1=5.50KWPjs=Kx×Pe=0.70×5.50=3.85KWQjs=Pjs×tgφ=3.85×0.75=2.89KW钢筋调直机,数量n=1Kx=0.70,cosφ=0.80,tgφ=0.75,Pe=5.50×1=5.50KWPjs=Kx×Pe=0.70×5.50=3.85KWQjs=Pjs×tgφ=3.85×0.75=2.89KW钢筋切断机,数量n=2Kx=0.70,cosφ=0.80,tgφ=0.75,Pe=5.50×2=11.00KWPjs=Kx×Pe=0.70×11.00=7.70KWQjs=Pjs×tgφ=7.70×0.75=5.78KW照明箱,数量n=5Kx=1.00,cosφ=1.00,tgφ=0.00,Pe=10.00×5=50.00KWPjs=Kx×Pe=1.00×50.00=50.00KWQjs=Pjs×tgφ=50.00×0.00=0.00KW照明箱,数量n=1Kx=1.00,cosφ=1.00,tgφ=0.00,Pe=15.00×1=15.00KWPjs=Kx×Pe=1.00×15.00=15.00KWQjs=Pjs×tgφ=15.00×0.00=0.00KW塔式起重机QTZ40,数量n=3Kx=0.50,cosφ=0.80,tgφ=0.75,Pe=21.70×3=65.10KWPjs=Kx×Pe=0.50×65.10=32.55KWQjs=Pjs×tgφ=32.55×0.75=24.41KW施工升降机SC200,数量n=4Kx=0.70,cosφ=0.80,tgφ=0.75,Pe=33.00×4=132.00KWPjs=Kx×Pe=0.70×132.00=92.40KWQjs=Pjs×tgφ=92.40×0.75=69.30KW交流电焊机,数量n=2Kx=0.50,cosφ=1.00,tgφ=0.00,Pe=35.00×2=70.00KWPjs=Kx×Pe=0.50×70.00=35.00KWQjs=Pjs×tgφ=35.00×0.00=0.00KW对焊机,数量n=1Kx=0.50,cosφ=1.00,tgφ=0.00,Pe=100.00×1=100.00KWPjs=Kx×Pe=0.50×100.00=50.00KWQjs=Pjs×tgφ=50.00×0.00=0.00KW总的计算负荷计算,总箱同期系数Kx=0.9总的有功功率Pjs=Kx×∑Pjs=0.9×(3.08+1.54+5.32+11.2+3.85+3.85+7.7+50.0+15.0+32.55+92.4+35.0+50.0)=280.34KW总的无功功率Qjs=Kx×∑Qjs=0.9×(2.31+1.16+3.99+8.4+2.89+2.89+5.78+0.0+0.0+24.41+69.3+0.0+0.0)=109.02KVA总的视在功率Sjs=Pjs2+Qjs2=280.342+109.022=300.79KVA总的计算电流Ijs=Sjs=300.79=434.17A23×Ue1.732×0.4五、选择变压器根据计算的总的视在功率与最大干线功率(以单个开关箱的最大功率逐级计算选择)取大值选择S7-315/10型三相电力变压器,它的容量为315.0kVA300.81kVA能够满足使用要求,其高压侧电压为10kV同施工现场外的高压架空线路的电压级别一致。六、设计配电系统干线1线路计算在选择前应对照平面图和系统图先由用电设备至开关箱计算,再由开关箱至分配箱计算,选择导线及开关设备。分配箱至开关箱,开关箱至用电设备的导线采用BX-橡皮绝缘电线铜芯穿硬塑料管敷设。分箱1计算各设备至设备开关箱计算塔式起重机QTZ40开关箱到塔式起重机QTZ40导线截面及开关箱内电气设备选择(开关箱以下机械启动后需要系数取1):A.计算电流Kx=1,cosφ=0.8,tgφ=0.75,Pe=21.7KWIjs=Kx×Pe=1×21.7=39.15A23×Ue×cosφ1.732×0.4×0.8B.选择导线与开关等选择BX-3×10+2×6,其穿硬塑料管敷设时安全载流量为52A选择开关箱型号与箱内电气设备开关箱选择JSP-K/2,箱内开关为DZ20T-40/3,其额定电流值为40A。漏电保护器为DZ15LE-40/2901。照明箱开关箱到照明箱导线截面及开关箱内电气设备选择(开关箱以下机械启动后需要系数取1):A.计算电流Kx=1,cosφ=1.0,tgφ=0,Pe=10.0KWIjs=Kx×Pe=1×10.0=14.43A23×Ue×cosφ1.732×0.4×1.0B.选择导线与开关等选择BX-3×2.5+2×1.5,其穿硬塑料管敷设时安全载流量为22A选择开关箱型号与箱内电气设备开关箱选择JSP-K/1,箱内开关为DZ47-32/2,其额定电流值为32A。漏电保护器为DZ47LE-32/2。施工升降机SC200开关箱到施工升降机SC200导线截面及开关箱内电气设备选择(开关箱以下机械启动后需要系数取1):A.计算电流Kx=1,cosφ=0.8,tgφ=0.75,Pe=33.0KWIjs=Kx×Pe=1×33.0=59.54A23×Ue×cosφ1.732×0.4×0.8B.选择导线与开关等选择BX-3×16+1×10,其穿硬塑料管敷设时安全载流量为68A选择开关箱型号与箱内电气设备开关箱选择JSP-K/2-B,箱内开关为DZ47-63/2,其额定电流值为63A。漏电保护器为DZ15LE-63/2901。插入式振动器开关箱到插入式振动器导线截面及开关箱内电气设备选择(开关箱以下机械启动后需要系数取1):A.计算电流Kx=1,cosφ=0.8,tgφ=0.75,Pe=1.1KWIjs=Kx×Pe=1×1.1=1.98A23×Ue×cosφ1.732×0.4×0.8B.选择导线与开关等选择BX-3×2.5+1×1.5,其穿硬塑料管敷设时安全载流量为22A选择开关箱型号与箱内电气设备开关箱选择JSP-K/1,箱内开关为DZ47-32/2,其额定电流值为32A。漏